Incoming_links
SpaceUSE

Definition

This process manages procedures of the unloading of goods from a vehicle and taking them to the warehouse

The visual and counting check, based on the reference information of the goods issue document, are carried out during unloading.

...

Overview

The cargo and accompanying documents have arrived at the warehouse and are awaiting acceptance and counting procedures.

To start the acceptance procedure, it is necessary to identify the cargo sender, check all documents for compliance, and find the reference order in the system. At this step, permissions for passing the vehicle to warehouse area and place it in unloading zone are printed and provided to drivers.

After this, the goods are unloaded from the truck to the receiving area. Visual control is carried out during unloading of goods. The unloaded goods are counted. The counting results are recorded in the system.

Accepted goods should then be submitted for verification procedures.

As a result, goods are accepted and counted.

Video guide

Widget Connector
urlhttp://youtube.com/watch?v=GtOXI4To-XM

Accept and count goods flowchart

BPMN Modeler Enterprise
attachmentIdBpmn33395750
diagramBackgroundColor#ffffff
enableCustomViewerHeightfalse
diagramName

...

Accept and count goods

...

showBpmnLinkstrue
showAnyLinkstrue
showConfluencePageLinkstrue
showAttachmentsInTabfalse
showDmnLinkstrue
showEmbeddedCommentstrue
saveZoomPositionfalse
showJiraIssueLinkstrue
showBpmnJsPaneltrue
shownAttachmentVersion

...

4
showDmnInTabfalse
viewerHeight250
commentedSavingfalse
vbcpEntIdvxcp-ent-id-6d8dc044-421d-42ff-aa86-e8523c3f3553
showConfluenceAttachmentLinkstrue
showExternalContentLinkstrue
showMdfInstanceLinkstrue
showMaximalHeightfalse
loadImageInViewermodel
showBpmnInTabfalse
showDocumentationtrue
showJiraIssuesInTabfalse

Paths

...

See how it works

...

PathWarehouse and delivery → Warehouse management → Receipt
In-app link EN code
Text_to_copy
e1cib/app/DataProcessor.InboundWarehouseMangement
In-app link RU code
Text_to_copy
e1cib/app/Обработка.УправлениеПоступлением

How to start goods acceptance procedures

1. Go to Warehouse and delivery, then click Receipt underWarehouse management.

2. In the Goods receipt at warehouse workplace, select a Warehouse.

3. Find the Goods receipt with the To receive status, and open it.

4. In the Goods receipt document, enter the Document number and date, according to shipping documents

5. Click Main tab, then select Assignee.

6. Set the In progress status, Post the document.

How to register goods actually received

1. In the Goods receipt document, click the Goods tab, select By cargo view mode.

2. Scan the label of the Item, or enter it manually.

3. Specify the Quantity, Weight, or Volume, according to the delivery notification.

Info
titleNote

To populate with purchase order data:

  • Click Fill in → Items and quantity, then select the available Date of receipt.

4. Scan the label of the Packing list, or enter it manually.

How to submit goods receipt

1. In the Goods receipt document, set the Processing is requiredstatus

2. Post the document

How to check delivery documents

Check incoming shipping documents before unloading.

How to create goods receipt document

Go to the Inbound delivery workplace.

Select the warehouse.

Find an order corresponding to the incoming shipping documents.

Choose the order and click Create note to generate a Goods receipt note.

...

If the actual delivery is not in the list of expected deliveries, create a Duty for the responsible manager to indicate the basis for the inbound delivery.

How to allow unloading

Make a decision on accepting the goods and provide permission to place the vehicle for unloading.

How to unload goods

The goods are unloaded from the truck to the receiving area. Fill in the Goods receipt form.

How to maintain batch

Go to the Goods receipt note.

Indicate the package to select the storage area. 

Specify the batches and indicate the production and expiration dates.

Print the labels.

How to execute visual and counting check

Visually verify the goods and decide on further actions.

How to initiate task to procurement team

If there are problems in the process of checking the documents or visually verifying the goods, further registration of the shipment is suspended.

Set the Processing is required status of the Goods receipt note.

Click Generate - Duty.

...

.