Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Incoming_links
SpaceUSE

Definition

This process manages procedures of the unloading of goods from a vehicle, counting them before taking to the warehouse.

The visual and counting check, based on the reference information of the goods issue document, are carried out during unloading.

...

Overview

The cargo and accompanying documents have arrived at the warehouse and are awaiting acceptance and counting procedures.

To start the acceptance procedure, it is necessary to identify the cargo sender, check all documents for compliance, and find the reference order in the system. At this step, permissions for passing the vehicle to warehouse area and place it in unloading zone are printed and provided to drivers.

After this, the goods are unloaded from the truck to the receiving area. Visual control is carried out during unloading of goods. The unloaded goods are counted. The counting results are recorded in the system.

Accepted goods should then be submitted for verification procedures.

As a result, goods are accepted and counted.

Video guide

Widget Connector
urlhttp://youtube.com/watch?v=GtOXI4To-XM

Accept and count goods flowchart

BPMN Modeler Enterprise
attachmentIdBpmn33395750
diagramBackgroundColor#ffffff
enableCustomViewerHeightfalse
diagramName

...

Accept and count goods
showBpmnLinkstrue
showAnyLinkstrue
showConfluencePageLinkstrue
showAttachmentsInTabfalse
showDmnLinkstrue
showEmbeddedCommentstrue
saveZoomPositionfalse
showJiraIssueLinkstrue
showBpmnJsPaneltrue
shownAttachmentVersion

...

4
showDmnInTabfalse
viewerHeight250
commentedSavingfalse
vbcpEntIdvxcp-ent-id-6d8dc044-421d-42ff-aa86-e8523c3f3553
showConfluenceAttachmentLinkstrue
showExternalContentLinkstrue
showMdfInstanceLinkstrue
showMaximalHeightfalse
loadImageInViewermodel
showBpmnInTabfalse
showDocumentationtrue
showJiraIssuesInTabfalse

...

See how it works

...

Paths

PathWarehouse and delivery → Warehouse management → Receipt
In-app link EN code
Text_to_copy
e1cib/app/DataProcessor.InboundWarehouseMangement
In-app link RU code
Text_to_copy
e1cib/app/Обработка.УправлениеПоступлением

How to start goods acceptance procedures

1. Go to Warehouse and delivery, then click Receipt underWarehouse management.

2. In the Goods receipt at warehouse workplace, select a Warehouse.

3. Find the Goods receipt with the To receive status, and open it.

4. In the Goods receipt document, enter the Document number and date, according to shipping documents

5. Click Main tab, then select Assignee.

6. Set the In progress status, Post the document.

How to register goods actually received

1. In the Goods receipt document, click the Goods tab, select By cargo view mode.

2. Scan the label of the Item, or enter it manually.

3. Specify the Quantity, Weight, or Volume, according to the delivery notification.

Info
titleNote

To populate with purchase order data:

  • Click Fill in → Items and quantity, then select the available Date of receipt.

4. Scan the label of the Packing list, or enter it manually.

How to submit goods receipt

1. In the Goods receipt document, set the Processing is requiredstatus

2. Post the document

How to check incoming delivery documents

Check incoming shipping documents before unloading.

How to start receiving of goods

Go to the Inbound delivery workplace.

Select the Warehouse.

Find and open corresponding Goods receipt note.

Enter the Document number and date of the document. 

Set the In progress status.

Info
titleNote

If the actual delivery is not in the list of expected deliveries, create a Duty for the responsible manager to resolve the issue with the inbound delivery.

Print and issue permission for passing the vehicle to warehouse area and place it in unloading zone.

How to unload and count goods

Unload goods from the truck to the receiving area.

Open the Goods receipt document, go to the Goods tab.

Fill in the Quantity, Weight, Volume.

Info
titleNote

Pay attention thet goods can be usually counted in package units, specified by purchasing manager.

Specify the batches and indicate the production and expiration dates.

Print the labels on packages.

Execute visual and counting check, decide on further actions.

How to initiate task to procurement team

If there are problems in the process of checking the documents or visually verifying the goods, further registration of the shipment is suspended.

Set the Processing is required status of the Goods receipt note.

Click Generate - Duty.

...

.