Overview
This process involves receiving materials ordered within the production supply scenario in the shop floor stockroom.
Receive materials at shop floor stockroom flowchart
Paths
Path | Manufacturing → Shop-floor manufacturing accounting → Production documents (all) |
---|---|
In-app link EN code |
e1cib/app/DataProcessor.LogOfProductionDocuments
|
In-app link RU code |
e1cib/app/Обработка.ЖурналДокументовПроизводства
|
How to register materials receipt at shop floor stockroom
1. Go to Manufacturing and then click Production documents (all) under Shop-floor manufacturing accounting.
2. Select a Company.
3. Open the Transfer of materials to shop floor stockroom document with the Issued status.
4. In the Transfer of materials to shop floor stock room document, click the More tab.
5. Enter the Date of receipt.
6. Set the Received status.
7. Post the document.