Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Definition


Excerpt

The scenario describes the production process following the make-to-stock model, where products can be and usually made before a sales order confirmation.

Sales orders are typically supplied from existing stock, and production orders are used to replenish those stocks.

The scenario starts with the creation of production orders for large quantities of standardized products based on the plans and ends with a production of all quantities of the product required by the plan.

The scenario is applied for discrete manufacturing and can't be applied for continuous manufacturing. Each production stage can be individually started, postponed, the lot can be changed at any moment of production. Discrete manufacturing requires a multistage production process with numerous interdependent steps to make a specific product. The complex structure of a product required defining a complex product bill of material, routings, and operations with defined materials. The production is done in several stages with many intermediate products which are used in other intermediate or finished products.

Very likely, the make-to-order/assemble-to-order and make-to-stock scenarios can be combined. Intermediate products are made in stock, while finished products are made 

The scheduling focuses on maximization of output by ensuring maximization of machine utilization and optimization of production lot sizes.


Legend

Excerpt Include
How to navigate E2E processes
How to navigate E2E processes
nopaneltrue

Scenario Diagram

BPMN Modeler Enterprise
attachmentIdBpmn33395887
diagramBackgroundColor#ffffff
enableCustomViewerHeightfalse
diagramNamePl2P Make-to-stock Discrete manufacturing
showBpmnLinkstrue
showAnyLinkstrue
showConfluencePageLinkstrue
showAttachmentsInTabfalse
showDmnLinkstrue
showEmbeddedCommentstrue
saveZoomPositionfalse
showJiraIssueLinkstrue
showBpmnJsPaneltrue
shownAttachmentVersion7
showDmnInTabfalse
viewerHeight250
commentedSavingfalse
vbcpEntIdvxcp-ent-id-a3071a79-7969-43ac-9e7a-b66d1cadebf5
showConfluenceAttachmentLinkstrue
showExternalContentLinkstrue
showMdfInstanceLinkstrue
showMaximalHeightfalse
loadImageInViewermodel
showBpmnInTabfalse
showDocumentationtrue
showJiraIssuesInTabfalse

Business processes list