Overview

This process helps you create production orders for recycling for specific tasks related to splitting the main product into components for recycling needs.

With these production orders, you can create a schedule by items and quantity, control the order execution, and manage demand for production.

When you create a production order for recycling, specify the main product to decompose into components. The BOM outlines required operations and components. Default standard BOM and route sheets are specified for each product ordered for recycling. Sometimes this data can be filled manually in production stages.

As a result of this process, a production order for recycling is created.

Create production orders for recycling flowchart

Create production orders for recycling

(v.0)

Loading diagram...

Paths

PathManufacturing → Production scheduling and controlling → Production orders
In-app link EN code

e1cib/list/Document.ProductionOrder2_2

In-app link RU code

e1cib/list/Документ.ЗаказНаПроизводство2_2

How to create production orders for recycling

Manually

1. Go to Manufacturing and then click Production orders under Production scheduling and controlling.

2. Click Create and select New.

3. In the Production order document, click the Main tab.

4. Select a Company and a Dispatching unit.

5. In the Type field, select Recycling.

6. Select a Line of business if necessary.

7. Select an Assignment if the product must be remanufactured under a certain order (a sales order, a repair order, and other).

8. Click the More tab.

9. Select a Person responsible.

10. Leave the Separate supply of materials and works check box cleared as it is recommended for the scenario.

Plan-based production orders

See how to Generate plan-based production orders.

Demand-driven production orders

See how to Generate demand-driven production orders.

How to fill products for recycling

1. In the Production order document, click the Products for recycling tab.

2. Click Add and fill the Item, Variant, and Quantity columns.

3. Select a product destination Warehouse for each line.

Note

Keep in mind that you need to specify only products to recycle in orders. You do not need to specify components into which they are decomposed.

4. Enter the Earliest start date.

Note

Note that orders contain only a planned start date. You cannot specify an end date as the order forward scheduling is not supported for recycling.

How to fill bills of materials

1. In the Production order document, click the Products for recycling tab.

2. Select the BOM column, open the Bills of materials list, and choose one option from the list.

3. Select a BOM relevant to the scenario.

Note

Note that a recycling scenario BOM normally includes one recycling stage. Several recycling stages are possible in rare cases.

If necessary, send a request to a production master data manager.

How to save production orders

1. In the Production order document, set the Queued status.

2. Post the document.

The system will automatically:

  • Check if required fields and their values are filled.
  • Indicate an error kind.
  • Provide recommendations on how to fix the error.
  • No labels