Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Table of Contents
outlinetrue
typeflat

Overview


Excerpt

The external subcontracting scenario involves the flow of processes required to transfer the entire production stage to an external subcontractor.

You can initiate the scenario from any production scenario.

Compared to S2P Subcontract manufacturing scenarios, the external subcontracting scenario does not require registration of transfer of raw materials and components to a subcontractor as well as return of a processed product/component.

This scenario is typically used when the production stage is performed by a subcontractor on the company's shop floor. More rarely, this scenario is used when the production stage is performed outside the company's shop floor, and transportation is managed by the company.

Purchase of an external subcontracting service follows the usual S2P Purchase standard services scenario.

...

BPMN Modeler Enterprise
attachmentIdBpmn39689287
diagramBackgroundColor#ffffff
enableCustomViewerHeightfalse
diagramNamePl2P External subcontracting
showBpmnLinkstrue
showAnyLinkstrue
showConfluencePageLinkstrue
showAttachmentsInTabfalse
showDmnLinkstrue
showEmbeddedCommentstrue
saveZoomPositionfalse
showJiraIssueLinkstrue
showBpmnJsPaneltrue
shownAttachmentVersion5
showDmnInTabfalse
viewerHeight250
commentedSavingfalse
vbcpEntIdvxcp-ent-id-9f966328-b1a9-4185-addb-a7d3c7f63115
showConfluenceAttachmentLinkstrue
showExternalContentLinkstrue
showMdfInstanceLinkstrue
showMaximalHeightfalse
loadImageInViewermodel
showBpmnInTabfalse
showDocumentationtrue
showJiraIssuesInTabfalse

Links to User Guide

Links to Setup Guide