You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 9 Next »

Definition

A production order for recycling is created for specific tasks related to the breakdown of the main product into components for the recycling needs.

The production order is used to create a schedule by items and quantity, to control order execution, to manage demand for production.

A production order for recycling is created specifying the main product to be dismantled into components. The BOM defines the required operations and required components. Default standard BoM (and route sheets) specified for each product ordered for recycling. Sometimes this data can be filled in manually in production stages.

As a result of this process, a production order for recycling is created.

Business process diagram

Create production order for recycling

(v.0)

Loading diagram...

How to create production order for recycling

Manually

Go to the Production orders list.

Click the Create → New command.

In the Production order document, go to the Main tab.

Select the Company, Dispatching unit.

Select the Recycling in the Type field.

Select the Line of business if it is required.

Select the Assignment if the product should be remanufactured for the certain order (sales order, repair order, etc.).

Go to the More tab.

Select the Person responsible.

Leave the Separate supply of materials and work checkbox unselected (recommended for the scenario).

Based on plan

See how to Generate production order based on plan.

Based on demand

See how to Generate production order based on demand.

How to fill in products for recycling

In the Production order document, go to the Products for recycling tab.

Click Add and fill in Items, Variant, Quantity

Select the product destination Warehouse for each line.

Note

In the order, indicate only the products to be recycled. It is not necessary to specify the components into which it decomposes.

Enter the Earliest start date.


Note

The order specifies only the planned start date. The end date can't be specified, because order forward scheduling is not supported for recycling.

How to fill in bill of materials

Go to the Products for recycling tab.

Select the BOM column and open the Bills of materials list and choose one option from the list.

Select the special BoM relevant for the scenario.

Note

The recycling scenario BoM includes normally one, rarely several recycling stages.

If it is necessary, send a request to a production master data manager.

How to save production order

Set the Queued status.

Post the document. The system will automatically:

  • Perform standard checks on the filling-in of required fields and their values;
  • Indicate the error kind;
  • Provide recommendations for correcting the error.
  • No labels