Overview

You can create production orders for recycling for specific tasks related to breakdown of the main product into components for recycling needs.

Use these production orders to create a schedule by items and quantity, control order execution, manage demand for production.

When you create a production order for recycling, specify the main product to be dismantled into components. The BOM defines the required operations and components. Default standard BOM and route sheets are specified for each product ordered for recycling. Sometimes this data can be filled manually in production stages.

As a result of this process, a production order for recycling is created.

Create production orders for recycling flowchart

Create production order for recycling

(v.0)

Loading diagram...

How to create production orders for recycling

Manually

1. Go to Manufacturing and then click Production orders under Production scheduling and controlling.

2. Click Create → New.

3. In the Production order document, click the Main tab.

4. Select a Company and a Dispatching unit.

5. Select Recycling in the Type field.

6. Select a Line of business if it is required.

7. Select an Assignment if the product should be remanufactured under a certain order (a sales order, a repair order, and other).

8. Click the More tab.

9. Select the Person responsible.

10. Leave the Separate supply of materials and work check box cleared as it's recommended for the scenario.

Plan-based

See how to Generate plan-based production orders.

Demand-driven

See how to Generate demand-driven production orders.

How to fill products for recycling

1. In the Production order document, click the Products for recycling tab.

2. Click Add and fill Items, Variant, Quantity.

3. Select the product destination Warehouse for each line.

Note

In the order, indicate only the products to recycle. You do not need to specify the components into which they are decomposed.

4. Enter the Earliest start date.


Note

The order specifies only the planned start date. The end date can't be specified as the order forward scheduling is not supported for recycling.

How to fill bills of materials

1. Click the Products for recycling tab.

2. Select the BOM column, open the Bills of materials list, and choose one option from the list.

3. Select the BOM relevant to the scenario.

Note

The recycling scenario BOM includes normally one, rarely several recycling stages.

If it is necessary, send a request to a production master data manager.

How to save production orders

1. Set the Queued status.

2. Post the document.

The system will automatically:

  • Check if required fields and their values are filled.
  • Indicate an error kind.
  • Provide recommendations for correcting the error.